Electrical news and engineering . Pipe Line Kunning ])ai;ilkl wilh l-luiiu- which come down the canyon. It is intended to handlethese latter by booms in the pond above. The most difficultproblem in design was to obtain satisfactory sluices at aminimum cost which would satisfactorily permit of quickoperation and maintain a constant head during flood. Thelocation of the dam in the canyon so situated in referenceto the railway track and with no possibility of enlarge-ment of spillway area, without tunnelling on the south side,had to be met by construction of gates which could be liftedclear—were
GLIX-115-2AXGAC5
Magyarország
Kollekció
GLIX Prime
Novel Use
Fotós / Szerző
The Reading Room
Leírás
Electrical news and engineering . Pipe Line Kunning ])ai;ilkl wilh l-luiiu- which come down the canyon. It is intended to handlethese latter by booms in the pond above. The most difficultproblem in design was to obtain satisfactory sluices at aminimum cost which would satisfactorily permit of quickoperation and maintain a constant head during flood. Thelocation of the dam in the canyon so situated in referenceto the railway track and with no possibility of enlarge-ment of spillway area, without tunnelling on the south side,had to be met by construction of gates which could be liftedclear—were