. Our farm and building book. . ud of the result. There are many interesting features.The cellar wall reaches just above theground line. Commencing at the top ofthe wall a frame work of 2 by 6 sup-ports the sill at a height sufficient toraise the floor joists 7 feet 6 inches inthe clear above the concrete cellar floor.The cellar windows are set in this frame-work, which permits the building of asolid wall reaching clear around the ex-cavation without a break. The grade entrance at the side isstarted even with the top of this lowwall so that the steps down give easyaccess to the cellar and the

GLIX-115-2CH8FAR

. Our farm and building book. . ud of the result. There are many interesting features.The cellar wall reaches just above theground line. Commencing at the top ofthe wall a frame work of 2 by 6 sup-ports the sill at a height sufficient toraise the floor joists 7 feet 6 inches inthe clear above the concrete cellar floor.The cellar windows are set in this frame-work, which permits the building of asolid wall reaching clear around the ex-cavation without a break. The grade entrance at the side isstarted even with the top of this lowwall so that the steps down give easyaccess to the cellar and the
A képet csak az alábbi országokban használhatja fel:
Magyarország
Kollekció

GLIX Prime

Novel Use

Fotós / Szerző

Reading Room 2020

Leírás

. Our farm and building book. . ud of the result. There are many interesting features.The cellar wall reaches just above theground line. Commencing at the top ofthe wall a frame work of 2 by 6 sup-ports the sill at a height sufficient toraise the floor joists 7 feet 6 inches inthe clear above the concrete cellar floor.The cellar windows are set in this frame-work, which permits the building of asolid wall reaching clear around the ex-cavation without a break. The grade entrance at the side isstarted even with the top of this lowwall so that the steps down give easyaccess to the cellar and the

Licenc: Rights Managed

Jelentkezzen be a letöltéshez!