220401-N-KN989-1003 WAIANAE, Hawaii (April 1, 2022) Naval Sea Systems Command (NAVSEA) contractors begin the final phase of an equipment removal project at Nanakuli Beach Park. The final phase of the three-phase project focuses on removing a 20-inch conduit and the top portions of three manhole/vaults, then laying colored cement over the remaining conduit trench and matching the natural rock color and surface height. CNRH,HAWAII,Melvin J. Gonzalvo,NAVSEA,Nanakuli,Naval Sea Systems Command,

GLIX-115-2M64R1R

220401-N-KN989-1003 WAIANAE, Hawaii (April 1, 2022) Naval Sea Systems Command (NAVSEA) contractors begin the final phase of an equipment removal project at Nanakuli Beach Park. The final phase of the three-phase project focuses on removing a 20-inch conduit and the top portions of three manhole/vaults, then laying colored cement over the remaining conduit trench and matching the natural rock color and surface height. CNRH,HAWAII,Melvin J. Gonzalvo,NAVSEA,Nanakuli,Naval Sea Systems Command,
A képet csak az alábbi országokban használhatja fel:
Magyarország
Kollekció

GLIX Prime

Novel Use

Fotós / Szerző

Operation 2022

Készült
Leírás

220401-N-KN989-1003 WAIANAE, Hawaii (April 1, 2022) Naval Sea Systems Command (NAVSEA) contractors begin the final phase of an equipment removal project at Nanakuli Beach Park. The final phase of the three-phase project focuses on removing a 20-inch conduit and the top portions of three manhole/vaults, then laying colored cement over the remaining conduit trench and matching the natural rock color and surface height. CNRH,HAWAII,Melvin J. Gonzalvo,NAVSEA,Nanakuli,Naval Sea Systems Command,

Licenc: Rights Managed

Jelentkezzen be a letöltéshez!