The east main tower of the Lion’s Link Bridge captured from the air. Dongguan,China.26th March 2026. The east and west main towers of the Lion’s Link Bridge, a critical controlling component of the Lion’s Link Passage, a core hub project in the Guangdong‑Hong Kong‑Macao Greater Bay Area, were topped out, marking the shift to the superstructure construction phase, March 26, 2026. The Lion’s Link Passage adopts a single‑span suspension‑bridge design with a main span of 2,180 meters crossing the river, and features a double‑deck, 16‑lane layout. Upon completion, the project will set five world re

GLIX-115-3E4BT9X

The east main tower of the Lion’s Link Bridge captured from the air. Dongguan,China.26th March 2026. The east and west main towers of the Lion’s Link Bridge, a critical controlling component of the Lion’s Link Passage, a core hub project in the Guangdong‑Hong Kong‑Macao Greater Bay Area, were topped out, marking the shift to the superstructure construction phase, March 26, 2026. The Lion’s Link Passage adopts a single‑span suspension‑bridge design with a main span of 2,180 meters crossing the river, and features a double‑deck, 16‑lane layout. Upon completion, the project will set five world re
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Novel Use

Fotós / Szerző

Cns photo, CNSphoto

Készült
Leírás

The east main tower of the Lion’s Link Bridge captured from the air. Dongguan,China.26th March 2026. The east and west main towers of the Lion’s Link Bridge, a critical controlling component of the Lion’s Link Passage, a core hub project in the Guangdong‑Hong Kong‑Macao Greater Bay Area, were topped out, marking the shift to the superstructure construction phase, March 26, 2026. The Lion’s Link Passage adopts a single‑span suspension‑bridge design with a main span of 2,180 meters crossing the river, and features a double‑deck, 16‑lane layout. Upon completion, the project will set five world re

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!