An aerial shot showing the east (foreground) and west (background) main towers of the Lion’s Link Bridge. Dongguan,China.26th March 2026. The east and west main towers of the Lion’s Link Bridge, a critical controlling component of the Lion’s Link Passage, a core hub project in the Guangdong‑Hong Kong‑Macao Greater Bay Area, were topped out, marking the shift to the superstructure construction phase, March 26, 2026. The Lion’s Link Passage adopts a single‑span suspension‑bridge design with a main span of 2,180 meters crossing the river, and features a double‑deck, 16‑lane layout. Upon completio
GLIX-115-3E4BTAG
Kizárólag sajtó felhasználásra.
Magyarország
NEM engedélyezett felhasználási módok:
personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUseKollekció
GLIX Prime
Novel Use
Fotós / Szerző
Cns photo, CNSphoto
Készült
Leírás
An aerial shot showing the east (foreground) and west (background) main towers of the Lion’s Link Bridge. Dongguan,China.26th March 2026. The east and west main towers of the Lion’s Link Bridge, a critical controlling component of the Lion’s Link Passage, a core hub project in the Guangdong‑Hong Kong‑Macao Greater Bay Area, were topped out, marking the shift to the superstructure construction phase, March 26, 2026. The Lion’s Link Passage adopts a single‑span suspension‑bridge design with a main span of 2,180 meters crossing the river, and features a double‑deck, 16‑lane layout. Upon completio