London, UK - 10th April 2026: A line of reflective traffic cones blocks the entry to the new slip road at the Silvertown Tunnel south portal. The industrial architecture of the portal building stands in the background as engineering works enter their fourth day. Despite the tunnel marking its first anniversary on April 7, persistent resurfacing issues have kept this vital access point closed to public transport and local traffic, highlighting ongoing "snagging" challenges in the major London project. Credit:xiu bao/Alamy Live News

GLIX-115-3E7D1JK

London, UK - 10th April 2026: A line of reflective traffic cones blocks the entry to the new slip road at the Silvertown Tunnel south portal. The industrial architecture of the portal building stands in the background as engineering works enter their fourth day. Despite the tunnel marking its first anniversary on April 7, persistent resurfacing issues have kept this vital access point closed to public transport and local traffic, highlighting ongoing
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Novel Use

Fotós / Szerző

xiu bao

Készült
Leírás

London, UK - 10th April 2026: A line of reflective traffic cones blocks the entry to the new slip road at the Silvertown Tunnel south portal. The industrial architecture of the portal building stands in the background as engineering works enter their fourth day. Despite the tunnel marking its first anniversary on April 7, persistent resurfacing issues have kept this vital access point closed to public transport and local traffic, highlighting ongoing "snagging" challenges in the major London project. Credit:xiu bao/Alamy Live News

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!