04 May 2026, Saxony, Markkleeberg: View of the secured lock in the Störmthal Canal between Lake Markkleeberg (r) and Lake Störmthal. After landslides in the embankment of the lock, the canal was closed at the beginning of 2021. Since then, the mining rehabilitation company LMBV has been investigating the causes and examining possible remediation. A feasibility study is now available, which concludes that the restoration of the canal is feasible and that the net cost would be around 17 million euros. The approximately 850-metre-long canal connects two flooded former open-cast lignite mines. (Ae

GLIX-115-3ED70B5

04 May 2026, Saxony, Markkleeberg: View of the secured lock in the Störmthal Canal between Lake Markkleeberg (r) and Lake Störmthal. After landslides in the embankment of the lock, the canal was closed at the beginning of 2021. Since then, the mining rehabilitation company LMBV has been investigating the causes and examining possible remediation. A feasibility study is now available, which concludes that the restoration of the canal is feasible and that the net cost would be around 17 million euros. The approximately 850-metre-long canal connects two flooded former open-cast lignite mines. (Ae
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Fotós / Szerző

dpa, dpa picture alliance

Készült
Leírás

04 May 2026, Saxony, Markkleeberg: View of the secured lock in the Störmthal Canal between Lake Markkleeberg (r) and Lake Störmthal. After landslides in the embankment of the lock, the canal was closed at the beginning of 2021. Since then, the mining rehabilitation company LMBV has been investigating the causes and examining possible remediation. A feasibility study is now available, which concludes that the restoration of the canal is feasible and that the net cost would be around 17 million euros. The approximately 850-metre-long canal connects two flooded former open-cast lignite mines. (Ae

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!