Wewelsfleth, Germany. 06th May, 2026. View into the tunnel at the construction site of the Suedlink Elbe tunnel ElbX at a media event as part of the 3rd Tennet Grid Summit. The grid operator Tennet expects the tunnel bores under the Elbe for the Suedlink power line to be completed around July. The Suedlink north-south power line, which is around 700 kilometers long, will transport direct current between the north and south of Germany. Credit: Christian Charisius/dpa/Alamy Live News
GLIX-115-3EDR2BN
Kizárólag sajtó felhasználásra.
Magyarország
NEM engedélyezett felhasználási módok:
personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUseKollekció
GLIX Prime
Fotós / Szerző
dpa, dpa picture alliance
Készült
Leírás
Wewelsfleth, Germany. 06th May, 2026. View into the tunnel at the construction site of the Suedlink Elbe tunnel ElbX at a media event as part of the 3rd Tennet Grid Summit. The grid operator Tennet expects the tunnel bores under the Elbe for the Suedlink power line to be completed around July. The Suedlink north-south power line, which is around 700 kilometers long, will transport direct current between the north and south of Germany. Credit: Christian Charisius/dpa/Alamy Live News