Elsfleth, Germany. 21st May, 2026. Cable drums stand in front of the Elsfleth West substation site with high-voltage systems, electricity pylons and a wind turbine in the background. The Elsfleth/West site is part of the TenneT grid expansion to 380 kilovolts in the northwest of Lower Saxony. Credit: Sina Schuldt/dpa/Alamy Live News

GLIX-115-3EGXPGA

Elsfleth, Germany. 21st May, 2026. Cable drums stand in front of the Elsfleth West substation site with high-voltage systems, electricity pylons and a wind turbine in the background. The Elsfleth/West site is part of the TenneT grid expansion to 380 kilovolts in the northwest of Lower Saxony. Credit: Sina Schuldt/dpa/Alamy Live News
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Fotós / Szerző

dpa, dpa picture alliance

Készült
Leírás

Elsfleth, Germany. 21st May, 2026. Cable drums stand in front of the Elsfleth West substation site with high-voltage systems, electricity pylons and a wind turbine in the background. The Elsfleth/West site is part of the TenneT grid expansion to 380 kilovolts in the northwest of Lower Saxony. Credit: Sina Schuldt/dpa/Alamy Live News

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!