Koblenz, Germany. 13th Oct, 2026. The middle section of the Pfaffendorf Bridge is still missing. The new bridge is being built parallel to the old one. The two steel sections, each weighing 475 metric tons, were preassembled in Mannheim and can only be transported to the construction site by water. Due to the current low water levels, the navigation channel is not deep enough for transport. Credit: Thomas Frey/dpa/Alamy Live News
GLIX-115-3FT0XTJ
Kizárólag sajtó felhasználásra.
Magyarország
NEM engedélyezett felhasználási módok:
personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUseKollekció
GLIX Prime
Fotós / Szerző
dpa, dpa picture alliance
Készült
Leírás
Koblenz, Germany. 13th Oct, 2026. The middle section of the Pfaffendorf Bridge is still missing. The new bridge is being built parallel to the old one. The two steel sections, each weighing 475 metric tons, were preassembled in Mannheim and can only be transported to the construction site by water. Due to the current low water levels, the navigation channel is not deep enough for transport. Credit: Thomas Frey/dpa/Alamy Live News