Nemzetközi sajtófotók & Magyar szerzők hazai képei

info board képek

26 találat
  • / 1
  • kép/oldal:
RM
Information board, Schwenninger Moos Nature Reserve, source of the Neckar River, Villingen-Schwenningen, Black Forest, Baden-Wuerttemberg, Germany, Europe-stock-foto
RM
Central station, travellers in the platform hall. Extensive construction work on the railway network is communicated on the display board, Stuttgart, Baden-Württemberg, Germany-stock-foto
RM
Teacher working on scheduling board for timetable, manpower planning-stock-foto
RM
Barbed wird fence around the former prison and information board on Robben Island, Cape Town, South Africa, Africa-stock-foto
RF
Information sign with street map, Berlin-Mitte, Berlin, Germany-stock-foto
RM
Duty-Free Shop and a departure board in the waiting area at a boarding gate, Fuerteventura Airport, Canary Islands, Germany, Europe-stock-foto
RM
Information sign, Darss, Nationalpark Vorpommersche Boddenlandschaft national park, Fischland-Darss-Zingst peninsula, Mecklenburg-Western Pomerania, Germany, Europe-stock-foto
RM
Josep Tarradellas Airport Barcelona-El Prat, passengers at check-in with luggage, information board, Barcelona, Spain-stock-foto
RM
Text panel warning doctors against pre-natal sex determination, an initiative to prevent the abortion of girls, Tikse, Thiksey or Thiske, Ladakh, Jammu and Kashmir, Indian Himalayas, North India, India, Asia-stock-foto
RM
Indicator for hymns in the Marienkirche church, Reutlingen, Swabian Alb, Baden-Wuerttemberg, Germany, Europe-stock-foto
RM
Information desk with LED display board, departures, Ngurah Rai Airport or Denpasar International Airport, Tuban, Bali, Indonesia-stock-foto
RF
Directional sign indicating the way to various places of interest in Berlin, Germany-stock-foto
RM
Museum and memorial at the Hacienda Napoles, former estate of drug baron Pablo Escobar, head of the Medellin Cartel, Puerto Triunfo, Antioquia, Colombia, South America-stock-foto
RF
Advertising poster, ca 1920, showing a garden courtyard with arcade and tower, San Giovanni degli Eremiti is a Norman church building in Palermo, Sicily, Italy, Historical, digitally restored reproduction from a 19th century original-stock-foto
RM ED
Bus stop in the countryside in Vierkirchen, 13.05.2021. Vierkirchen, Saxony, Germany-stock-foto
RM
Against right-wing extremism, fascism and the AfD, large demonstration on Schlossplatz with 20, 000 participants, Stuttgart, Baden-Württemberg, Germany-stock-foto
RM
Scoreboard at Essen Central Station shows train delays and cancellations, Essen, Ruhr area, North Rhine-Westphalia, Germany-stock-foto
RM
Combined bus and cycle lane, Unter den Linden Palace Bridge, Berlin-Mitte, Germany-stock-foto
RM
Combined bus and cycle lane, Unter den Linden Palace Bridge, Berlin-Mitte, Germany-stock-foto
RM
Peek & Cloppenburg department stores at night, P & C, illuminated poster sale, clearance sale, textile retail chain, Düsseldorf, North Rhine-Westphalia, Germany-stock-foto
RM
Illuminated shop window with poster Sale, cyclist rides past, sale at Peek & Cloppenburg, P & C, textile retail chain, Düsseldorf, North Rhine-Westphalia, Germany-stock-foto
RM
Farmers' protest action, tractor with protest display, Straße des 17. Juni, Berlin, Germany-stock-foto
RM
Election campaign posters on the occasion of the state election in Hesse on 08 October 2023 hang one after the other on several lampposts in Frankfurt am Main., Nordweststadt, Frankfurt am Main, Hesse, Germany-stock-foto
RM
The book "Mein Kampf", 1936 edition, by Adolf Hitler, part of the permanent exhibition, "Fascination and Violence", in the Documentation Centre Nazi Party Rally Grounds, Nuremberg, Middle Franconia, Bavaria, Germany-stock-foto
RM
Laboratory, analysis of a protein gel on a light panel, Centre for Medical Biotechnology University Duisburg-Essen, North Rhine-Westphalia, Germany, Europe-stock-foto
RM
Sign, lettering "Wir arbeiten ohne Gentechnik", German for "We work without genetic engineering", Demeter, in Cunnersdorf, Saxon Switzerland, Saxony, Germany, Europe-stock-foto