Editorial actual & illustrations

6 155 items
  • / 154
  • images/page:
RM
File photo dated 03/06/10 of Antony Gormley with his installation Breathing Room III, at the White Cube Gallery in London. Sculptor Sir Antony Gormley has been made a Companion of Honour in the King's Birthday Honours list, for services to Art. Issue date: Friday June 13, 2025.-stock-photo
RM
File photo dated 03-06-2025 of England head coach Brendon McCullum, who believes England’s white-ball fortunes are back on track under Harry Brook’s leadership, with glimmers of Ben Stokes in his new captain. Issue date: Wednesday June 11, 2025.-stock-photo
RM
File photo dated 11/03/06 of Uriah Rennie. Uriah Rennie, the first black Premier League referee, died yesterday at the age of 65. The Jamaica-born official grew up in Sheffield and oversaw more than 300 matches starting with his breakthrough appointment as Derby hosted Wimbledon in August 1997. The game was, however, abandoned to due floodlight failure. Issue date: Monday June 9, 2025.-stock-photo
RM
Roma, Rome, Italy. 7th June, 2025. Angelo Bonelli (L), Elly Schlein (C), Nicola Fratoianni (C) and Giuseppe Conte (R) march behind a banner during the national demonstration for Palestine, in Rome, Italy, on June 7, 2025. (Credit Image: © Vincenzo Nuzzolese/ZUMA Press Wire) EDITORIAL USAGE ONLY! Not for Commercial USAGE! Credit: ZUMA Press, Inc./Alamy Live News-stock-photo
RM
Rome, Rome, Italy. 6th June, 2025. Participants are seen during the closing event of the national referendum campaign in Piazza Testaccio, Rome, Italy, on June 6, 2025. The campaign supports five referendums, to be held on June 8 and 9, aimed at repealing parts of labor legislation, including measures against precarious work, unjust dismissals, and unsafe working conditions. (Credit Image: © Vincenzo Nuzzolese/ZUMA Press Wire) EDITORIAL USAGE ONLY! Not for Commercial USAGE! Credit: ZUMA Press, Inc./Alamy Live News-stock-photo
RM
Rome, Rome, Italy. 6th June, 2025. ANDREA OCCHIPINTI attends a press conference at Cinema Quattro Fontane in Rome, Italy, on June 6, 2025, following a meeting with the Minister of Culture on the crisis affecting the Italian film and audiovisual industry. (Credit Image: © Vincenzo Nuzzolese/ZUMA Press Wire) EDITORIAL USAGE ONLY! Not for Commercial USAGE!-stock-photo
RM
File photo dated 03/06/2025 of goalkeeper Anna Moorhouse, who has been included in Sarina Wiegman’s 23-player squad who will defend England’s title at the European Championship. Issue date: Thursday June 5, 2025.-stock-photo
RM
File photo dated 03/06/2025 of Lucy Bronze, who has been included in Sarina Wiegman’s 23-player squad who will defend England’s title at the European Championship. Issue date: Thursday June 5, 2025.-stock-photo
RM
File photo dated 03/06/2025 of Niamh Charles, who has been included in Sarina Wiegman’s 23-player squad who will defend England’s title at the European Championship. Issue date: Thursday June 5, 2025.-stock-photo
RM
Germany , Cottbus , 03.06.2025 , Prevention mobile of the German police-stock-photo
RM
Fussball; Saison 2024/2025; Season 2024/25; UEFA Nations-League; Halbfinale, Best of 4, Deutschland gegen Portugal am 04.06.2025 in München. UBz: 03 Robin Koch, Deutschland.-stock-photo
RM
Fussball; Saison 2024/2025; Season 2024/25; UEFA Nations-League; Halbfinale, Best of 4, Deutschland gegen Portugal am 04.06.2025 in München. UBz: 03 Robin Koch, Deutschland.-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. A measuring tape is used to control the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 freeway - Sauerlandlinie. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. A measuring tape is used to control the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 freeway - Sauerlandlinie. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. A measuring tape is used to control the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 freeway - Sauerlandlinie. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. Workers monitor the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 - Sauerlandlinie freeway. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. A worker uses a measuring tape to monitor the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 - Sauerlandlinie freeway. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. Workers monitor the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 - Sauerlandlinie freeway. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the bridge colossus on the A45 - Sauerlandlinie. This, together with the substructure with its up to 70-metre-high pillars, has been moved transversely since 03.06.2025. This will bring the structure closer to the second section of the bridge, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. Workers monitor the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 - Sauerlandlinie freeway. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. View of the foundation together with the shifting track for the up to 70 meter high piers of the bridge on the A45 freeway - Sauerlandlinie. This, together with the substructure with the up to 70-metre-high piers, has been shifted transversely since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. Workers monitor the shifting process on the shifting track for the up to 70-metre-high piers of the bridge on the A45 - Sauerlandlinie freeway. The bridge, including the substructure with the up to 70-metre-high piers, has been shifted crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
Wilnsdorf, Germany. 04th June, 2025. A worker stands between the 70 meter high pillars of the bridge on the A45 - Sauerlandlinie freeway. The bridge and its substructure with the up to 70-metre-high piers have been moved crosswise since 03.06.2025. This will bring the structure closer to the second section, which is currently carrying traffic. The relocation is expected to take up to 30 hours in total. Credit: Thomas Banneyer/dpa/Alamy Live News-stock-photo
RM
File photo dated 03/06/25 of firefighters and search teams checking a well at a derelict and abandoned property close to Praia De Luz, Portugal, where searches are being carried out by officers investigating the disappearance of Madeleine McCann, in countryside a few miles from the resort where she was last seen in 2007. Searches for Madeleine McCann are to resume in Portugal, near where the little girl was last seen in 2007. Issue date: Wednesday June 4, 2025.-stock-photo
RM
Düsseldorf, Deutschland, 03.06.2025 Granatapfel im Edeka Markt Zurheide im Crown Center in Düsseldorf - Innenstadt  Foto: Norbert Schmidt, Düsseldorf-stock-photo
RM
Düsseldorf, Deutschland, 03.06.2025 Granatapfel im Edeka Markt Zurheide im Crown Center in Düsseldorf - Innenstadt  Foto: Norbert Schmidt, Düsseldorf-stock-photo
RM
Düsseldorf, Deutschland, 03.06.2025 Granatapfel im Edeka Markt Zurheide im Crown Center in Düsseldorf - Innenstadt  Foto: Norbert Schmidt, Düsseldorf-stock-photo
RM
Düsseldorf, Deutschland, 03.06.2025 Windbeutel  in der Auslage der Bäckerei Büsch im  Crown Center in Düsseldorf - Innenstadt  Foto: Norbert Schmidt, Düsseldorf-stock-photo
RM
Giovanna Hoffmann (Deutschland, #18), Klara Buehl (Deutschland, #19), Sarai Linder (Deutschland, #02), Selina Cerci (Deutschland, #15), Stina Johannes (Deutschland, #12) jubeln ueber den Sieg, AUT, Oesterreich vs Deutschland, Frauen Fussball Nationalmannschaft, UEFA Womens Nations League, 6. Spieltag, Saison 2024/2025, 03.06.2025 Foto: Eibner-Pressefoto/Michael Memmler-stock-photo
RM
Jule Brand (Deutschland, #22) schreibt Autogramme fuer die Fans, AUT, Oesterreich vs Deutschland, Frauen Fussball Nationalmannschaft, UEFA Womens Nations League, 6. Spieltag, Saison 2024/2025, 03.06.2025 Foto: Eibner-Pressefoto/Michael Memmler-stock-photo