Gotha, Germany. 28th Apr, 2026. A participant in the press tour to mark the completion of the first part of the renovation project at Friedenstein Palace walks through the staircase. The new staircase with elevator and the roof in the west wing have been completed. Further measures are planned in the west wing and on the east tower with parts of the east wing. The project, with a total volume of 110 million euros, is being financed equally by the federal and state governments. Credit: Martin Schutt/dpa/Alamy Live News

GLIX-115-3EC143E

Gotha, Germany. 28th Apr, 2026. A participant in the press tour to mark the completion of the first part of the renovation project at Friedenstein Palace walks through the staircase. The new staircase with elevator and the roof in the west wing have been completed. Further measures are planned in the west wing and on the east tower with parts of the east wing. The project, with a total volume of 110 million euros, is being financed equally by the federal and state governments. Credit: Martin Schutt/dpa/Alamy Live News
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Fotós / Szerző

dpa, dpa picture alliance

Készült
Leírás

Gotha, Germany. 28th Apr, 2026. A participant in the press tour to mark the completion of the first part of the renovation project at Friedenstein Palace walks through the staircase. The new staircase with elevator and the roof in the west wing have been completed. Further measures are planned in the west wing and on the east tower with parts of the east wing. The project, with a total volume of 110 million euros, is being financed equally by the federal and state governments. Credit: Martin Schutt/dpa/Alamy Live News

Kulcsszavak

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!