Schwanau, Germany. 21st May, 2026. The tunnel boring machine for the second Munich main line is in a factory hall at the manufacturer Herrenknecht. Herrenknecht AG is delivering today's first tunnel boring machine for an exploratory tunnel along Munich's second main line, which is being accepted by customers of Deutsche Bahn (DB) and Arge Tunnel Hauptbahnhof (ATH). Credit: Philipp von Ditfurth/dpa/Alamy Live News

GLIX-115-3EGWTYJ

Schwanau, Germany. 21st May, 2026. The tunnel boring machine for the second Munich main line is in a factory hall at the manufacturer Herrenknecht. Herrenknecht AG is delivering today's first tunnel boring machine for an exploratory tunnel along Munich's second main line, which is being accepted by customers of Deutsche Bahn (DB) and Arge Tunnel Hauptbahnhof (ATH). Credit: Philipp von Ditfurth/dpa/Alamy Live News
EDITORIAL LICENC
Kizárólag sajtó felhasználásra.
A képet csak az alábbi országokban használhatja fel:
Magyarország

NEM engedélyezett felhasználási módok:

personalUse advertisingCommercialUse commercialElectronicUse consumerGoodsUse directMailBrochuresUse indoorDisplayUse internalBusinessUse
Kollekció

GLIX Prime

Fotós / Szerző

dpa, dpa picture alliance

Készült
Leírás

Schwanau, Germany. 21st May, 2026. The tunnel boring machine for the second Munich main line is in a factory hall at the manufacturer Herrenknecht. Herrenknecht AG is delivering today's first tunnel boring machine for an exploratory tunnel along Munich's second main line, which is being accepted by customers of Deutsche Bahn (DB) and Arge Tunnel Hauptbahnhof (ATH). Credit: Philipp von Ditfurth/dpa/Alamy Live News

Licenc: Rights Managed (editorial)

Jelentkezzen be a letöltéshez!